Box Haus
  • Home
  • Houses
    House series
    • Ground Box
    • Living Box
    • Twin Box
    By type
    • Domy parterowe
    • House directory
    By area
    • Domy do 80 m²
    Individual projects
    Customize the layout, exterior, and amenities to suit your needs.
    Ask about the project
    Technology and Q&A
    • Technology
    • Q&A
    • Construction Process
    • Prices
    Investments
    • All investments
    • Silesia
    • Other regions
    Zero-energy homes
    Save money on your bills from day one. Check out our projects.
    Our investments
  • Investments
  • Cooperation
    • Individual customer
    • Business
    • Developer
    • Contractor
  • Prices
  • Construction process
  • Blog
  • Gallery
  • Land buying
  • Contact
  • Facebook Instagram
  • Languages
    • Polski
    • English
  • Schedule a meeting
Blog
  1. Home
  2. Blog
  3. Bazowa kategoria
  4. How long does it take to build a prefabricated frame house?
How long does it take to build a prefabricated frame house?
18.12.2023 | Reading time : 2 min

How long does it take to build a prefabricated frame house?

How long does it take to build a prefabricated timber-frame house?

 


The construction of a prefabricated timber-frame house takes much less time than with masonry buildings. This type of building is becoming increasingly popular and is mainly chosen by people who value the quickness of the entire construction process. Prefabricated timber-frame houses are gaining popularity on the Polish market. In the European market, particularly the Scandinavian, German, and Austrian markets, no one is surprised that a house can be built within a few weeks.

 


A prefabricated timber-frame house is first constructed in one of the factories in Katowice region, where external walls, internal walls, ceilings, and the roof structure are built under controlled conditions. Very often, windows, external doors, and external wall insulation are installed straight away. Conduits are run in the walls to facilitate the installation of electrical systems. For structurally simple buildings, this takes about 2-3 days. For more difficult and larger buildings, up to 2 weeks.

 


During the period when the walls are prefabricated at the factory, a foundation slab is prepared on the client's plot. After the concrete has set and hardened sufficiently, the building is assembled. In just one day, all the external and internal walls of the house and the roof structure are in place. Single-storey buildings on trusses are usually ready to be closed within 3-4 days. Larger buildings of greater complexity may take up to two weeks.

 


Building assembly takes place practically all year round. Weather conditions that may prevent assembly include temperatures below -10°C, strong winds, or heavy rainfall.

Assembly of a prefabricated building
Assembly of a prefabricated building
Assembly of a prefabricated building
Assembly of a prefabricated building
Assembly of a prefabricated building
Assembly of a prefabricated building
Assembly of a prefabricated building
Assembly of a prefabricated building
Geometric shapes decor

Box Haus Sp. z o.o.
ul. Wyspiańskiego 6a
42-600 Tarnowskie Góry

NIP: 6351844867
REGON: 369312535
KRS: 0000715071

Sales office
ul. Kwiatowa 2B
43-195 Mikołów

Open:
Mon-Fri: 9:00-16:00

T: +48 570 497 000
M: sprzedaz@box-haus.pl

Sales department
+48 570 497 000 wew.1

Technical department
+48 570 497 000 wew.9

  • Privacy policy
Logo BOX HAUS
This website uses cookies. By using the website you consent to the use of cookies.
Copyright © 2021-2026 Box-Haus.pl
Web designer:Profesjonalne strony internetowe - FlatArt